Location
Highlights Of Corrosion Control
&
Cathodic Protection Projects

Dates

Tehran

Auto Body Cathodic Protection System

1997

Ahar

Survey, Design, Supervision & Commissioning for water reticulation
(Satarkhan Dam)

1998
Karaj Survey,Design,Supply & Construction for water pipeline (61KM) 1998

Tehran

Intelligent Cathodic Protection System

1998

Ahvaz Shoaibieh Survey, Design, Supply & Construction for fuel pipeline 1999
All over the IRAN Corrosion Control Systems for Transmitter Tower (IRIB) 1999
Zahedan Survey & Commissioning for water pipeline (192KM) 2000
Zirab Survey, Design, Supervision & Commissioning for water pipeline 2000/2001
Mahshahr port Repairing of Cathodic Protection System for 8 jetties,20 off shore stations and 18 light houses

2002/2003
Saveh Survey and Commissioning for water pipeline 2002
North of Tehran Survey and Commissioning for potable water supply pipeline 2002
South Pars (Total) Installation Cathodic Protection System for Phase 2&3

2000/2001
Tabriz Survey, Design and Construction of Cathodic Protection System for underground pipeline and storage tanks - Sahand power plant

2003
Abadan

Full Survey (Pipeline and Coating Integrity) and Technical Inspection for Abadan-Arvand water pipeline (52KM)

2003
Azna Survey & Construction of Cathodic Protection System for gas pipeline (63 KM) 2003

Khark Island

Survey, Design, Supply & Construction of Cathodic Protection System for 2 jetties

2004

Semnan

Survey, Supply & Construction of Cathodic Protection System for phase II Semnan water pipeline (31 KM)

2005

Koohrang

Survey, Design, Supply & Construction of Cathodic Protection System for Koohrang-Shahr-e Kord water pipeline (92 KM)

2004/2005
Lavasan

Survey, Design, Supply & Construction of Cathodic Protection System for water pipeline (2000mm-14 KM)

2004/2005
Karaj

Survey, Design, Procurement & Construction of Cathodic Protection System for Mahestan Shopping Center (Concrete Structure)

2005
Sari

Survey, Design, Supply & Construction of Cathodic Protection System for Sari-Neka oil pipeline (36 KM)

2005
Ardebil Survey & Design of Cathodic Protection System for water reticulation (Ardebil Dam) 2005
Tabriz Inspection Survey (DCVG+CIPS) for Zarrrine rood-Tabriz PCP water pipeline (2000mm-40 KM)

2007
Arak Survey, Design, Supply & Construction of Cathodic Protection System for Kamal Saleh-Arak water pipeline (1000mm-78 KM)

2007/2008
Mashad Survey, Design, Supply & Construction of Cathodic Protection System for Doosti Dam-Mashad water pipeline (2000mm-180 KM)

2008/2009
Jolfa Survey, Design, Supply & Construction of Cathodic Protection System for Golfaraj field water pipeline (2000mm PC & steel pipeline)

2008/2009
Bandar Abbas Inspection Survey (DCVG+CIPS) for Bandar Abbas-Qeshm gas pipeline (12inch - 69KM)

2009
Zanjan Inspection Survey (DCVG+CIPS) for Ray-Tabriz oil pipeline
(14inch - 22KM)

2009
Shahid Bahonar harbor Survey, Design, Supply & Construction of Cathodic Protection System for C1 & C5 Jetties

2009
Esfahan Inspection Survey (DCVG+CIPS) for Esfahan-Yazd gas pipeline
(30inch - 75KM)

2009
Neka-Jask pipeline Survey & Design of Cathodic Protection System for oil transmission pipeline between the Caspian sea port of Neka to the gulf of Oman port of Jask. (1643KM) 2009
Sirjan Inspection Survey (DCVG+CIPS) for gas pipeline (255KM)

2009/2010
Quchan Inspection Survey (DCVG+CIPS & C-Scan) for Sarakhs-Neka high pressure gas pipeline (30inch - 50KM)

2009/2010

Neka-Sari Inspection Survey (DCVG+CIPS & C-Scan) for Neka-Sari gas pipeline (30inch - 21KM)

2009/2010
Tabriz Survey, Design, Supply & Construction of Cathodic Protection System for Tabriz-Miandoab oil pipeline (14inch-160 KM) 2010
Sar-Khoon & Qeshm Inspection Survey (DCVG+CIPS) for gas pipeline
(Sar-Khoon & Qeshm Gas Treating Company)

2010
Bandar Abbas Survey & Design of Cathodic Protection System for Seawater intake & out fall system pipeline for P.G.S.O.C (2700mm-6KM)  
Qeshm Survey, Design, Supply & Construction of Cathodic Protection System for Qeshm oil terminal & bunkering storage tanks

2010
Esfahan Inspection Survey (DCVG+CIPS) for Esfahan gas pipelines
(198KM)

2010
Jam Inspection Survey (DCVG+CIPS) for Assalouyeh- Fajr refinery gas pipeline (42inch - 36KM)

2010
Abadan Inspection Survey (DCVG+CIPS) for Abadan refinery parallel pipelines 2010
Aftab Port Survey, Design, Supply & Construction of Cathodic Protection System for Kish gas field development storage tanks 2010
Bojnourd Inspection Survey (DCVG+CIPS & C-Scan) for Sarakhs-Neka high pressure gas pipeline (30inch - 100KM) 2010
 
 
 
© ZANG SETIZAN SHARGH IT DEPARTMENT All Rights Reserved 2006
Fitbit started with rolex replica physical fitness equipment, recently replica watches released its first smart watch Ionic, starting price of replica watches uk $ 300, scheduled for October shipments, and next week debut of a new generation of Apple Watch on the same stage fight. Two smart watches are swiss replica watches no need to match with the smart phone, you can perform some functions, the use of more convenient.